Click on photo for actual size
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
thumb
Ask more information
#0757 AUC #F227 AUC DATE 17 February 2024 ( BANGNA KM. 35 )

BULLDOZER
WHEEL DOZER
IWAFUJI
T-10A
T10A-209
3KC1-121262
Remark : EXCLUDE 5% THAI IMPORT DUTY

  • YEAR : -
  • BANGNA KM. 35
  • 453


Price Calculation
Auction price 200,000
Import Duty 5% ( may vary for different types of goods ) 10,000
Total Price Before VAT 210,000
VAT 7 % 14,700
Total Price Before Buyer Fee 224,700
Buyer Fee 7% 14,000
VAT 7% from Buyer Fee 980
price 200,000 Custom service fee/LOT 3,500
VAT 7% from custom service fee 245
TOTAL PRICE 243,425
*** This Total Price Still Excludes Other Import-Related Expenses Such As Registration Fee, Transport Fee, Etc.
KM.35 KM.35 Free Zone auction yard (Items import taxes not yet paid)

Manufacture year / Working hour / Mileage as shown on the machine Auctioneer does not certify/guarantee the accuracy of machine information/description
*** Please inspect the actual machine before bidding

DRIVER SEAT
   OPERATOR CABIN CANOPY
   MONITOR PANEL Repairs or replacement required
   OPERATOR SEAT Repairs or replacement required
ENGINE
   OIL LEAK Repairs or replacement required
   ENGINE BLOW EXHAUST EMISSION Repairs or replacement required
   WATER PUMP WATER LEAK Wear and Damages are within the tolerances of its operating hours
   WATER LEAK FROM RADIATOR Wear and Damages are within the tolerances of its operating hours
HYDRAULIC CYLINDER
   LIFT/OIL LEAK FROM CYLINDER Workable but repairs or replacement needed
   TILT/OIL LEAK FROM CYLINDER Workable but repairs or replacement needed
HYDRAULIC SYSTEM
   OIL LEAK FROM VALVE,HOSE,PIPING Workable but repairs or replacement needed
   HYD.PUMP,HYD.MOTOR CONDITION Workable but repairs or replacement needed
   HYDRAULIC OIL Workable but repairs or replacement needed
   CONTROL LEVER CONDITION Repairs or replacement required
OPERATION
   RIGHT STEERING BREAK /CLUTCH Wear and Damages are within the tolerances of its operating hours
   LEFT STEERING BREAK/CLUTCH Wear and Damages are within the tolerances of its operating hours
   CLUTCH BRAKE CONDITION Wear and Damages are within the tolerances of its operating hours
   RIGHT STEERING BREAK /CLUTCH Wear and Damages are within the tolerances of its operating hours
   LEFT STEERING BREAK/CLUTCH Wear and Damages are within the tolerances of its operating hours
   FORWARD Wear and Damages are within the tolerances of its operating hours
   CLUTCH BRAKE CONDITION Wear and Damages are within the tolerances of its operating hours
OVERALL APPEARANCE
   GENERAL APPEARANCE-FRONT Wear and Damages are within the tolerances of its operating hours
   GENERAL APPEARANCE-REAR Wear and Damages are within the tolerances of its operating hours
   GENERAL APPEARANCE-RIGHT Wear and Damages are within the tolerances of its operating hours
   GENERAL APPEARANCE-LEFT Wear and Damages are within the tolerances of its operating hours
   GENERAL APPEARANCE-UPPER Wear and Damages are within the tolerances of its operating hours
   APPEARANCE FOR EACH COVER Wear and Damages are within the tolerances of its operating hours
UNDERCARRIAGE CONDITION
   TRANSMISSION CONDITION Wear and Damages are within the tolerances of its operating hours
   FRONT AXLE CONDITION Wear and Damages are within the tolerances of its operating hours
   REAR AXLE CONDITION Wear and Damages are within the tolerances of its operating hours
   WHEEL CONDITION/FRONT/RIGHT Workable but repairs or replacement needed
   WHEEL CONDITION/FRONT/LEFT Workable but repairs or replacement needed
   WHEEL CONDITION/REAR/RIGHT Workable but repairs or replacement needed
   WHEEL CONDITION/REAR/LEFT Workable but repairs or replacement needed
BLADE
   BLADE CONDITION Wear and Damages are within the tolerances of its operating hours
   EDGE CONDITION Wear and Damages are within the tolerances of its operating hours
ELECTRIC SYSTEM
   LIGHTING SYSTEM CONDITION Repairs or replacement required
   BATTERY CONDITION Without Battery
REMARK
   REMARK Machine Have Problem เสื้อสูบแตก,ทะลุ
   

โปรดให้คะแนนความพึงพอใจเพื่อการปรับปรุงและพัฒนา

ให้คะแนนการ Inspection

           

ให้คะแนนรูปภาพ